Back
Consolidated multiple A&D & Industrial group sites into a single Enterprise PLM system with zero downtime
Banner Image
Banner Image
HIGHTLIGHTS
22
PLM sites consolidated (12 A&D, 10 Industrial); transformed data for additional 14 A&D locations
13
Legacy apps retired, affecting 10,000+ users
5.5M
Objects (36TB data) migrated/transformed with 99.5% accuracy
Business Opportunities
  • Establish a centralized, validated, and fully synchronized Teamcenter instance across all customer locations.
  • Enable transition from drawing-centric current state of work to new model-centric design state of work to improve digital continuity and accelerate engineering efficiency.
  • Eliminate data chase by organizing information through A&D BOI relationships for better visibility and faster decision-making.
  • Enhance data security and compliance by embedding IP and trade control attributes during migration.
Features
  • Bulk load and delta migration approach executed using an extensible, reusable eQube® migration framework.
  • Standard eQube® connectors used to extract data from Teamcenter, Windchill, EPDM, and legacy ERP systems.
  • Upgraded existing Teamcenter data to a new, enhanced PLM model.
  • Business rule-driven transformation to resolve BOI conflicts and attribute inconsistencies.
  • Complex transformation rules applied for attributes, BOI relationships, and conflicting item ID resolution.
  • BOMs consolidated while preserving CAD data integrity across NX, Creo, and SolidWorks systems.
  • Part families migrated with data profiling and quality checks embedded into the migration flow.
eQube® Benefits
  • Zero-downtime migration executed using eQube®'s extensible migration framework.
  • Reusable migration solution design leveraged common patterns across source and destination systems.
  • Rapid deployment using eQube®-DaaS with no negative impact on downstream systems.
  • 99.5% data accuracy achieved through automated validation in migration pipelines.
  • Data anomalies identified and resolved pre-migration using eQube® Data Profiler.
  • Achieved 20X faster time-to-value (TTV) compared to manual approaches and reduced TCO 15X by retiring 13 home grown (legacy) applications.
eQ Process
  • Executed TC:TC (Teamcenter to Teamcenter) transformation and EXT:TC (External system to Teamcenter) migration across 26 A&D locations and 10 industrial locations.
  • Used eQube®-MI with reusable templates and no-code logic for bulk and delta migrations.
  • Source data processed via standard eQube® connectors from Windchill, EPDM, Teamcenter, and legacy ERPs; and loaded into target TC.
  • Used eQube®-MI with reusable templates and no-code logic for bulk and delta migrations.
  • Consolidated BOMs while preserving CAD integrity across NX, Creo, and Solidworks; transformed Part Families and attributes.
  • Resolved data quality issues and conflicting IDs through configurable mapping and BOI rules.
  • Deployed in planned waves with rollback support, ensuring zero disruption to operations.
A&D PLM Migrations and Transformations
eQube® Products used
eQube® Connectors used
Fill the form to download the entire success story!
Verify Captcha