400k BOMS
Across 4 BOM types
1.1 Million
BOM lines migrated
< 10 days
Total time to migrate
Business Opportunities
  • Engineering data was scattered in multiple applications.
  • This data needed to be consolidated into Teamcenter, their PLM system.
  • The investment already made on eQube®-DaaS Platform to be extended for this initiative.
Features
  • Data profiling and migration from SAP to Teamcenter was carried out and then the data was verified with the source.
  • 400k BOM structures along with 1.1 m BOM lines migrated.
  • 600k Parts updated.
  • Profiling played a key role in providing anomalies and helped in data model design.
eQube® Benefits
  • Used eQube®-GMP framework for rapid solution configuration and execution.
  • eQube® strategy to split the migration in small chunks helped complete the task in less than 10 days.
  • Despite a complex environment, a perfect migration was achieved.
eQ Process
  • IETLV process followed i.e. - Identification, Extraction, Transformation, Load, and Validation.
  • Data profiling helped identify data quality issues before the migration.
  • eQube® Platform used for data profiling, migration, and post migration data clean-up activities in Teamcenter.
  • Migration strategy - bulk migration followed by incremental deltas.
  • A 100% validation of the data was carried out between source and the target.